BERKELEY HIGH SCHOOL
At Berkeley High School two major buildings (G and H) have been seismically
retrofitted, we are proceeding with plans to build two new buildings: a
student center with library and other services and a gymnasium with pool.
Roofs and heating systems have been replaced, the grounds improved, and
a host of other projects have been completed with Measure A Funds. The
proposed bond measure will add classrooms, modernize buildings and add
a better communication and monitoring system to increase security at this
site. The added classrooms are in the old gymnasium. This building has
seismic problems and will need to be completely remodeled to allow for
this change of function. The estimated cost of this project is:
| Planned Cost for Remodeling: |
$14,280,000
|
| Contingency for Unforeseen Conditions (10%): |
1,428,000
|
| Design, Inspection and Management: |
3,613,000
|
| TOTAL, adding classrooms in old gym: |
$19,321,000.
|
The City of Berkeley has a tax measure on the November 2000 ballot
to remodel the pool area and the shower area of the Old Gym. That work
is not included in this estimate. The C building, the Donahue Gymnasium
and the classroom portion of the Community Theater (A building) need to
be modernized. Measure AA will fix code violations, provide accessibility,
replace deteriorated floors, paint the buildings inside and out, remodel
some restrooms and replace some of the ceilings. In addition, a selected
Site Committee will explore ideas for some facilities educational improvements.
These educational changes will be developed by the instructional staff
in conjunction with the selected architect. The estimated cost of work
in these buildings is:
| Planned Cost for Required Modernization Work: |
$ 4,771,000
|
| Allowance for the Educational Facilities Upgrades: |
800,000
|
| Contingency for Unforeseen Conditions (10%): |
557,000
|
| Design, Inspection and Management: |
1,532,000
|
| TOTAL, C building, Donahue gym, classrooms in A: |
$ 7,660,000.
|
The communication systems at Berkeley High School need a great deal
of improvement. The District will place interior cameras in the most critical
buildings at Berkeley High School this year. Additional cameras will be
needed to cover the exterior of the school grounds and additional buildings,
including the planned new buildings. This will deter crime and expedite
apprehension of anyone who does commit a crime. The estimated cost of this
work is:
| Intercom/Speakers Supplied and Installed: |
$ 370,000
|
| Camera System Supplied and Installed: |
450,000
|
| Contingency for Unforeseen Conditions (10%): |
82,000
|
| Design, Inspection and Management: |
242,000
|
| Training of the BHS Staff: |
30,000
|
| TOTAL, communications systems: |
$ 1,174,000.
|
The total included for Berkeley High School in these three categories is $28,155,000.
KING MIDDLE SCHOOL
The main building at King will be seismically retrofitted under the
current bond. King Middle School still needs a new cafeteria and two buildings
need to be modernized.
The estimated cost of a new cafeteria is:
| New Construction: |
$ 3,960,000
|
| Contingency for Unforeseen Conditions (5%): |
198,000
|
| Design Inspection and Management: |
832,000
|
| TOTAL, new cafeteria: |
$ 4,990,000
|
The kitchen equipment will be funded from alternate sources - possibly
from the Food Service Reserve budget.
The Science building and the gymnasium both need to be modernized.
Measure AA will fix code violations, provide accessibility, replace deteriorated
floors, paint the buildings inside and out, remodel some restrooms and
replace some of the ceilings. In addition, a selected Site Committee will
explore ideas for some facilities educational improvements. These educational
changes will be developed by the instructional staff in conjunction with
the selected architect. The estimated cost of work in these buildings is:
| Planned Cost for Required Modernization Work: |
$ 1,632,000
|
| Allowance for the Educational Facilities Upgrades: |
400,000
|
| Contingency for Unforeseen Conditions (10%): |
203,000
|
| Design, Inspection and Management: |
559,000
|
| TOTAL, science building, gym, other: |
$ 2,794,000
|
The total for King Middle School in these two categories is $7,784,000.
WILLARD MIDDLE SCHOOL
Under the current bond, extensive renovations have been completed in
the gymnasium and are being completed in the old industrial arts building.
The District has replaced some systems in other buildings. The Willard
administrative building, classroom building and cafeteria/auditorium building
all need to be modernized. Measure AA will fix code violations, provide
accessibility, replace deteriorated floors, paint the buildings inside
and out, remodel some restrooms and replace some of the ceilings. In addition,
a selected Site Committee will explore ideas for some facilities educational
improvements. These educational changes will be developed by the instructional
staff in conjunction with the selected architect. The estimated cost of
work in these buildings is:
| Planned Cost for Required Modernization Work: |
$ 2,328,000
|
| Allowance for the Educational Facilities Upgrades: |
477,000
|
| Contingency for Unforeseen Conditions (10%): |
280,000
|
| Design, Inspection and Management: |
772,000
|
| TOTAL, buildings A, C, cafeteria: |
$ 3,857,000
|
FRANKLIN ELEMENTARY SCHOOL
Franklin Elementary School has been reopened to accommodate class size
reduction and increased enrollment. The District has done selective work
to the building in the past 10 years, but has never modernized the buildings.
Measure AA will fix code violations, provide accessibility, replace deteriorated
floors, paint the buildings inside and out, remodel restrooms and replace
ceilings. In addition, a selected Site Committee will explore ideas for
some facilities educational improvements. These educational changes will
be developed by the instructional staff in conjunction with the selected
architect. The estimated cost of work in these buildings is:
| Planned Cost for Required Modernization Work: |
$ 3,386,000
|
| Allowance for the Educational Facilities Upgrades: |
617,000
|
| Contingency for Unforeseen Conditions (10%): |
400,000
|
| Design, Inspection and Management: |
1,101,000
|
| TOTAL |
$ 5,504,000
|
ADULT SCHOOL
The Adult School has received very little work over the years. The District
intends to modernize the buildings. Measure AA will fix code violations,
provide accessibility, replace deteriorated floors, paint the buildings
inside and out, remodel restrooms and replace some of the ceilings. Here,
too, the District will—with the help of a selected site committee—explore
ideas for facilities educational improvements, to be developed by instructional
staff in conjunction with the selected architect. The estimated cost of
work in these buildings is:
| Planned Cost for Required Modernization Work: |
$ 5,247,000
|
| Allowance for the Educational Facilities Upgrades: |
680,000
|
| Contingency for Unforeseen Conditions (10%): |
593,000
|
| Design, Inspection and Management: |
1,630,000
|
| TOTAL |
$ 8,150,000
|
CHILD CARE FACILITIES
The Child Development Center (CDC) sites need a lot of work. The Berkeley Unified School District has three large child care sites: King CDC; Franklin Parent Nursery; and King Education Center (1810 Hopkins Street). Plans for Measure AA estimate two of these sites as new buildings and one as a modernization. Plans do not include transitional housing expenses for any of these sites. The District may need to temporarily utilize space at other sites (possibilities include Franklin and the current East Campus) or minimize the program during construction. The estimated cost of the replacement of the King CDC facility is as follows:
| New Building: |
$ 1,920,000
|
| Abate and Demolish the Current Building: |
96,000
|
| Redo the Grounds: |
400,000
|
| Contingency for Unforeseen Conditions (5%): |
121,000
|
| Design, Inspection and Management: |
577,000
|
| TOTAL, King CDC: |
$ 3,114,000
|
The estimated cost of replacement of the Franklin Parent Nursery facility is:
| New Building: |
$1,600,000
|
| Abate and Demolish the Current Building: |
85,000
|
| Redo the Grounds: |
210,000
|
| Contingency for Unforeseen Conditions (5%): |
95,000
|
| Design, Inspection and Management: |
428,000
|
| TOTAL, Franklin Parent Nursery |
$2,418,000
|
The 1810 Hopkins Street facility is newer and is generally in better shape than the other two sites. It does, however, need to be modernized. Measure AA will fix code violations, provide accessibility, replace deteriorated floors, paint the buildings inside and out, remodel some restrooms and replace some of the ceilings. We have estimated the cost of the work in this building as follows:
| Planned Cost for Required Modernization Work |
$ 412,000
|
| Contingency for Unforeseen Conditions (10%): |
41,000
|
| Design, Inspection and Management: |
136,000
|
| TOTAL, Hopkins Street CDC |
$ 589,000
|
The total for the three Child Development Facilities is
DISTRICT-WIDE IMPROVEMENTS
Some improvements are most effectively listed as district-wide. They include four categories: kitchen improvements at elementary schools, fire sprinklers, systems replacement, and grounds improvement at 6-12 sites.
KITCHEN IMPROVEMENTS AT ELEMENTARY SCHOOLS
The District currently has two kitchens where food is prepared – those at Jefferson and Willard schools. The School Board has passed a policy to promote the use of fresh and nutritious food at its schools. The Food Systems Project, a citizen/staff committee, has analyzed Berkeley schools for this purpose and has received an architect’s estimated cost of $5,820,000. This estimate includes equipment and facilities improvements. The equipment will be bought from other funds. The estimated capital improvement work is:
| Improvements: |
$ 3,350,000
|
| Contingency for Unforseen Conditions (10%): |
335,000
|
| Design, Inspection and Management: |
920,000
|
| TOTAL |
$ 4,605,000
|
FIRE SPRINKERS
The District’s buildings were built and retrofitted according to the
codes in force at the time of construction. The fire code has changed recently,
and a number of our buildings do not meet current code. The code has required
for quite a while that, if a building is of a certain size and if it is
constructed of wood, the building must have fire sprinklers. The code permitted
concrete buildings to be built without sprinklers or with sprinklers in
only certain areas. One example of this type of building is the B Building
at Berkeley High where a recent fire caused millions of dollars worth of
damage. The BUSD has a number of buildings which fall into this category,
including five buildings at Berkeley High, several Willard buildings, at
least one King building and five elementary schools. All of these buildings
met the code, but now need to be made much safer. Cost for the fire sprinklers
is estimated as a separate project. If the bond is successful, work will
probably be done in conjunction with the modernization work planned in
other categories listed above. The estimated work in these buildings is:
| Improvements: |
$ 3,757,000
|
| Contingency for Unforeseen Conditions (10%): |
376,000
|
| Design, Inspection and Management: |
1,240,000
|
| TOTAL |
$ 5,373,000
|
SYSTEMS REPLACEMENT
The Systems Replacement category includes roofing, painting and floor replacement work at most of our sites.
| District staff have catalogued all school buildings and roofs and have developed a replacement schedule. A total of $6,115,000 is allocated for roof replacement. |
| The district goal is to protect BUSD buildings by painting schools (inside and out) and replacing deteriorated floor coverings every decade. A total of $7,198,000 is allocated to replace floor coverings and paint school buildings. |
The total system replacement budget is $13,313,000.
LANDSCAPE IMPROVEMENT AT 6-12 SITES
BUSD Middle and High Schools need some exterior improvements. The District needs to upgrade the track at King, improve the softball field at Willard, remove the Longfellow annex and improve the resulting open space, improve many areas at Berkeley High, demolish the old East Campus and improve the open space north of Derby Street. Funds are allocated as follows:
| King Improvements: |
$ 375,000
|
| Longfellow Improvements: |
375,000
|
| Willard Improvements: |
375,000
|
| Berkeley High School Improvements: |
1,100,000
|
| East Campus Improvements: |
1,100,000
|
| Contingency for Unforeseen Conditions (5%): |
165,000
|
| Design, Inspection and Management: |
910,000
|
| TOTAL |
$ 4,400,000
|
PROGRAM COSTS
Some of our anticipated costs are best listed as "program costs". These expenses, while very real, are rarely tied to a specific project or a specific site. For example, the cost to issue bonds is not tied to an individual project or site.
CONTINGENCY FOR POSSIBLE STATE FUNDING SHORTFALL
The District has planned facilities work which depends upon receipt
of approximately $10 million for Berkeley High and King Middle School from
the State Office of Public School Construction (OPSC). The District will
apply for these projects under the modernization program. The State does
not currently have identified resources for BUSD’s eligibility. The State
has discussed ways to mitigate this problem, including reallocating funds
from other programs, asking the voters to approve additional bonds and
using some general fund revenues to fund modernizations. At this point,
since the funding is not guaranteed and since the work planned is definitely
needed, this $10 million has been listed as an expense.
The total contingency to cover the possibility of a State shortfall
is $10,000,000.
INFLATION
The category of inflation recognizes that the value of money changes
over time. The total inflation budget is based upon an accumulation of
the projected schedules of many individual projects. Measure AA planning
estimates a 4% annual inflation rate. The 1992 bond included a 3% inflation
rate. Our recent experience suggests that 3% is too low. Inadequate planning
for inflation impairs the District’s ability to meet construction commitments.
Choosing an inflation rate for a ten year period is difficult, but district
staff believe that a 4% rate is prudent, given the amount of public work
(the Bay Bridge, Oakland airport improvements, Oakland Unified’s $300 million
bond, etc.) planned in the immediate area.
The total inflation budget is $18,950,000.
ISSUANCE COSTS
The term "bond issuance" means the projected costs to issue BUSD’s general
obligation bonds. Each issuance incurs costs to compensate financial advisors
and pay for advertising and other expenses associated with selling bonds.
The District has used experience with the Measure A bonds to predict issuance
costs for Measure AA bonds. It is assumed that there will be five bond
issuances. If more than five are required, costs will increase.
The total issuance budget is $700,000.
PROGRAM MANAGEMENT
The program management budget includes expenses to the overall program
which cannot be specifically tied to a single project. These items include:
a 75% Director, a full time clerical position, a part time accounting position,
help to prepare State applications for funding, some outside planning assistance,
supplies, equipment, etc. The cost per year is $270,000, slightly less
than the amount currently budgeted for our Measure A effort.
The total program management budget is $2,700,000.
RISK POOL
The risk pool budget is intended to provide some cushion for cost overruns
during construction and to provide legal defense for the program. In the
past several years, the School Board has recognized that considerable unforeseen
expenses can occur in a large construction project. As an example, old,
undocumented underground fuel tanks were uncovered on three recent construction
sites. Construction can also be highly litigious and the cost for transactional
costs must be a part of the bond plan. If the District does not adequately
plan for these costs, it will end up deleting projects. The Board’s current
Facilities Plan includes a line item for all of these unknowns. It is budgeted
centrally and allocated to projects if the need arises. The Board’s current
Risk Pool budget is set at 5% of the overall construction program and has
proved to be an adequate set-aside.
The total Risk Pool budget is $5,939,000.
TOTAL EXPENSES
The proposed expenses total $125,551,000.
ADDITIONAL CONSIDERATIONS
Projects that may be considered if the District receives $10 million from the State.
Funding needs not adequately covered in Measure AA:
| Berkeley High School "B" Building. As of the date of this report, it is unknown what the costs will be to rebuild the fire-damaged "B" Building at Berkeley High. Measure AA contains no money to enhance the insurance funds for this building. |
| Additional Projects. Additional projects always emerge. We also have not covered all our needs. For example, the District may need to purchase and/or improve a space for administrative functions. The administration building reverts to the City in a few years and a new location for this function has not been identified. |
| System Replacement Projects. Systems replacement will be covered during the ten-year construction period of Measure AA. After this period, additional resources will need to be identified. |
| Inflation. Inflation is an educated guess. If the inflation rate is higher than predicted, additional funds will be needed to achieve the stated goals. |
| Income Offset. The Board may decide to use a portion of the bond interest proceeds for capital equipment rather than capital projects. This plan includes revenue of $5,240,000 from bond interest. There are always insufficient funds to replace tables, chairs, computers, vehicles, copiers, etc. |
Four sources of income are planned: the bond principal, the bond interest, the State’s Deferred Maintenance funds and income from the BSEP Fund 7.
The bond proceeds recommended are $116,500,000. The current plan suggests that bonds be issued as follows:
| March 2002 |
$ 25,000,000
|
| March 2003 |
25,000,000
|
| March 2004 |
25,000,000
|
| March 2005 |
25,000,000
|
| March 2007 |
16,500,000
|
| TOTAL |
$116,500,000
|
The Board of Education will need to formally decide each proposed issuance, and the exact timing of construction projects is difficult to predict, but major changes in the issuance schedule are not envisioned, since they will effect both the taxes and the amount needed to be reserved for inflation. The issuance schedule has been constructed so that the bond tax rate will not exceed that which already exists from the currently authorized rate for the 1992 general obligation bonds.
BOND INTEREST
Bond interest can be used for capital projects and for capital equipment
purchases. Measure AA plans are that all the interest generated would be
used to offset the expense of the construction.
The total estimated income from bond interest is $5,240,000.
DEFERRED MAINTENANCE
The State distributes facilities money to school districts based upon
the size of their General Fund budgets. Measure AA plans are predicated
on the State maintaining its current level of funding during the Measure
AA construction.
The District is planning for a total receipt of $2,430,000 during
the next 10 years.
BERKELEY SCHOOLS EXCELLENCE PROJECT FUND 7
The BSEP tax provides funding for four areas. One of these areas is
the School Building Maintenance and Security Fund. Years ago, this fund
was used to accomplish projects much like the system replacement and grounds
improvement projects listed above. Since FY 1993, in response to a BUSD
budget crisis, a large portion of the Fund has been allocated to fund basic
positions and supplies in the Maintenance Department If the Special Tax
Bond passes, BSEP funds would be redirected to system replacement and improvement
projects.
The total income from this source is estimated at $700,000.
TOTAL INCOME AND OFFSETS
The proposed total income is $125,551,000.